Accessibility: Small Text | Medium Text | Large Text | Larger Text

Welcome to Firelining Systems Ltd.

Structural fire protection, firestopping & firewall contractors. Other services include frameless steel encasement, fire boarding, fire rated partitioning, smoke & fire curtains, cavity fire barriers, air/CO2/heat leakage sealing, fire escapes, and protected exits.

Enquiry form for further information ...

industrial, commercial, fireboarding north east uk

An ISO 9001:2008, ISO 18001:2007, FIRAS & CHAS accredited company

Intumescent Spraying & Painting to Structural Steelwork

2 Hour fire protection using intumescent spraying to the structual steelDecorative, thin film intumescent coatings for the fire protection of internal and external steelwork for up to 120 minutes and woodwork for up to 1 hour.

As contractors to the construction industry, our intumescent spraying & painting teams either work directly on columns & beams, at our factory, prior to shipping to site; or onsite after the steelwork is erected and fixed into position.

2 Hour fire protection using intumescent spraying to the structual steelIntumescent coatings expand by about 50 times their original thickness when subjected to fire, forming a thick, insulating ‘char’ layer. When applied to structural steelwork, this 'char' layer insulates the steelwork from the fire, and slows down the rate of heating of the steelwork.

When heated to a critical temperature, structural steelwork will lose its load bearing capability and buckle or collapse. When a building is on fire, what is needed is TIME to evacuate the building and try to bring the fire under control. Intumescent coatings are a common way of providing this time, by delaying the time taken for the steelwork to reach this critical temperature.

Intumescent fire protectionDifferent applied thickness of intumescent coating will give varying thicknesses of 'char', and therefore differing time periods of fire resistance. The amount of applied intumescent required to give the specified period (usually 30, 60 or 90 minutes) is usually referred to as the 'loading' needed. For example, to protect a certain size steel section for 30 minutes might require a loading of 350 microns dry film thickness (dft) of intumescent. Fire Linings Systems Ltd. calculate the loadings and the required thicknesses of intumescent paint required, per individual steel section, for the timings required.

2 Hour fire protection using intumescent spraying to the underside of this city carpark

Intumescent Spraying & Painting to Interior & Exterior Woodwork

Our teams not only have expertise in spraying & painting structural steelwork, but we also have considerable experience with fire protecting new wood, old wood & Grade 2 listed wood - giving 1 hour fire protection.

The best thing is that, in most cases, the existing paint does NOT have to be removed first! Just call us for details.

 

For further information, including site directions and an online enquiry form, please visit our contact us page or give us a call on 0191 419 2195.

 

Warrington logo iso 9001 logo Firas logo